Servelec Controls has 40 years’ experience in delivering successful projects to clients in critical national infrastructure across the UK and around the world.

For examples of some of our projects, see the case studies below:

Nuclear

Sellafield PFCS Integrated Control Systems

Following successful completion of a control system for the PFCS doors, Servelec Controls was re-engaged to design and build four linked control systems to faci…

Hinkley B AIC SCADA System Replacement

A replacement SCADA system that replicated the functionality of the obsolete system but using modern, supported computer equipment.

Sellafield Silo Maintenance Facility (SMF) Control & Safety Systems

Working on behalf of Cavendish Nuclear and Balfour Beatty JV, Servelec Controls designed, manufactured, tested and delivered a complete control and safety syste…

Bradwell Sorting & Dissolution Facility Process Control & SCADA

The Bradwell Reactor Site is a post-operational nuclear power station which is being decommissioned. As part of the decommissioning activities, Intermediate Lev…

Torness and Heysham 2 DMS

Servelec Controls is currently engaged by EDF Energy in a series of major contracts, stretching over ten years, to replace the Diagnostic and Monitoring Systems…

Wylfa Dry Fuel Store Obsolescence Solution

The Dry Store Cells are used to provide a storage facility for irradiated fuel elements for a period after removal from the reactor, until their radioactivity l…

Dounreay Fast Reactor Control System Upgrade

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the closure programme at Britain’s former centre of fast reactor research a…

Hinkley B Rod Drop Monitoring COTS Integration

The recording of control rod drop times is a regulatory requirement of the nuclear site license. To overcome the spares issues with obsolete equipment, Servelec…

Dounreay LLLETP PLC and SCADA upgrades

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the closure programme at Britain’s former centre of fast reactor research a…

Sellafield Encapsulation Plant Control Upgrade

Servelec Controls carried out an Overall Project Requirements Definition and Analysis phase. This consisted of collating current information and establishing th…

Sellafield MER Radiological Surveillance System

The Magnox East River (MER) Radiological Surveillance System (RSS) is an Environmental Monitoring System (EMS) that covers several buildings.

Torness MUWTP & CPP Plant Upgrades

This project covered the make-up water treatment plant (MUWTP) comprising of the pre-treatment plant and de-ionisation plant.

Oil & Gas

Repsol Sinopec Rotating Equipment RtIS

Through a collaborative approach, Servelec Controls helped Repsol Sinopec (previously Talisman Sinopec) achieve its ambitious “Rotating Equipment Excellence Pro…

Simplification of Centrica’s DP6 offshore gas platform

At the end of 2012, Servelec Controls began formally working on a Remote Operations solution for Centrica, which would ultimately support the simplification of …

Refrigerant Replacement Dimlington Gas Terminal

The Dimlington Gas Terminal is where gas is treated prior to export to the National Transmission System. Servelec Controls was awarded a contract to make modifi…

Easington Fire & Gas System

Following the success of a £1.5million Emergency Shut Down system, Servelec Controls was commissioned to provide Easington with a new Fire & Gas System

Morecambe Bay Safety Systems

Morecambe Bay is home to seven Centrica Energy-owned offshore platforms and an onshore gas terminal, which have produced natural gas since 1985 and now account …

Etzel Gas Storage Facility

Servelec Controls had been ever-present on Project Viking at the Etzel Gas Storage Facility in Germany since 2006.

Babbage Field Development Integrated Control & Safety System

Servelec Controls is an independent systems integrator, providing missioncritical control and safety systems to new and established oil and gas operators across…

Emergency Shutdown Control System at the North Morecambe Terminal

The Barrow Terminal Optimisation Project (BTOP) was a phased period of work completed in September 2015 through which the two Centrica gas terminals at Barrow-i…

Technip Gas Compression Transmission Control and Safety System

Servelec Controls provided Technip with automated control and safety systems to ensure its natural gas was compressed, stored and delivered safely and securely.…

Jersey Gas Terminal Integrated Control & Safety System (ICSS)

Servelec Controls was awarded a contract to install a new Integrated Controls and Safety System (ICSSS) on the La Collette site, which included the design, supp…

Centrica DPPA Platform ESD and FGS Replacement

Servelec Controls has provided control and safety systems for Centrica’s producing assets for over ten years. As part of this work, in 2015 Centrica selected Se…

Centrica Emergency shutdown (ESD) safety system

Servelec Controls designed, implemented and commissioned an emergency shutdown (ESD) safety system as part of Centrica Storage’s York field development project …

Cyber Security Considerations for Industrial Control Systems

Designing and implementing a resilient industrial control network requires core competencies in both cyber security and industrial automation.

Control Systems for Teesside Gas Storage

The Teeside Gasport project was the construction of the world’s first dockside high pressure gas offloading facility for regasification vessels.

Renewable Energy

Storr Lochs Hydroelectric Power Station Refurbishment for SSE

As part of an overhaul of Storr Lochs by SSE, Servelec Controls completed a full upgrade and replacement of the low voltage distribution, protection and control…

Remote Control and Monitoring of Electrolysis Plants

Servelec Controls has been awarded numerous contracts by a large manufacturer of hydrogen energy systems to design, supply and install control systems for vario…

Control & Protection System for Hydrogen Gas Production

Servelec Controls was contracted by a large manufacturer of hydrogen energy systems to supply a turnkey, safety rated containerised control system for a water e…

Foyers Falls Power Station

Foyers Falls Power Station required a complete refurbishment/modernisation of the existing switchgear & control circuits that relate to the control & mo…