Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the closure programme at Britain’s former centre of fast reactor research and development.

Project Detail

The Dounreay Fast Reactor plant is currently in the process of decommissioning and as such the required monitoring functions of the overall system continue to evolve and require adaptation as the de-commissioning process progresses.

Servelec Controls’ main scope of supply under a sub-contract to Amec comprised the following:

  • The PLC system in the Sphere I/O station chamber using Omniflex’s Maxiflex PLCs
  • Remote PLC system in the ESB I/O station using Omniflex’s Maxiflex PLCs
  • Data monitoring system based on Intellution’s iFix SCADA package. The SCADA system comprises a pair of redundant iFix SCADA servers and a single iFix client
  • Alarm Annunciator System located in the DFR Control Room
  • UPS system and 24 VDC Power Supply Unit
  • Sphere I/O Panel
  • System printers and networking equipment

Case Study : Dounreay Fast Reactor Phase 4 Improvements - Dounreay Site Restoration Limited - Dounreay


Download the Dounreay case study here

Related Case Studies

Wylfa Dry Fuel Store Obsolescence Solution

The Dry Store Cells are used to provide a storage facility for irradiated fuel elements for a period after removal from the reactor, until their radioactivity l…

Hinkley B Rod Drop Monitoring COTS Integration

The recording of control rod drop times is a regulatory requirement of the nuclear site license. To overcome the spares issues with obsolete equipment, Servelec…

Dounreay LLLETP PLC and SCADA upgrades

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the closure programme at Britain’s former centre of fast reactor research a…