Servelec Controls undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solution for SSE (formerly Scottish & Southern Energy).

Built in 1952 to supply electricity to the island community, the Storr Lochs scheme is now an integral part of the national electricity supply network, producing an average of 8 Giga Watt hours of electricity per year.

As part of an overhaul of Storr Lochs by SSE, Servelec Controls completed a full upgrade and replacement of the low voltage distribution, protection and control equipment, providing a modern robust platform to support the station’s operation into the foreseeable future.

The Systems

As the main subcontractor, Servelec Controls undertook all of the design, installation and commissioning for all the panels, cabling and software required to upgrade the Storr Lochs systems.

The station houses two turbine generator sets (units), each requiring identical control, power, protection, Main Inlet Valve (MIV) and Automatic Voltage Regulator (AVR) panels. Each unit is controlled by its own Programmable Logic Controller (PLC) and a third controls the station ancillary services. Further panels operate these ancillary services, which include the station battery system, remote telemetry, building ventilation and extraction, winch house, station service change-over, and communications connections between the station, winch house and valve house.

Servelec Controls then supplied all spares, cabling, junction boxes and software to complete the installation. Servelec Controls programmed and integrated the various hardware and software applications from a variety of different manufacturers, including Allen Bradley, Rockwell, SEL and Voith as specified by SSE, into a single architecture, then carried out all the installation, testing and commissioning to provide a safe, reliable control system to run the Storr Lochs scheme for years to come.

Enhanced Solution

Servelec Controls has worked in partnership with SSE to successfully deliver numerous projects. This joint approach has enabled the integration of best practice with operating experience from previous projects to develop and improve project delivery. The integrated electrical and control system at Storr Lochs will benefit from a number of upgraded features:

  • Automated station control based on reservoir level
  • Visual indication from the HMIs (Human Machine Interface)
  • Improved Alarm & Event Monitoring & Data Logging
  • Robust remote links back to the central control room at Perth

Benefits

The new control system will provide a reliable, fully automated and user friendly system to support electricity generation from Storr Lochs for the next 25 years. Designed to standards consistent with other facility upgrade projects across the SSE fleet, it will provide improved control, a commonality of spares and reduce the amount of operator training required.

Ian Heywood Programmes Lead Engineer (C&I) at SSE said: "We chose Servelec Controls because of their software knowhow and technical expertise in control system integration. The project was completed to a high technical standard and we’re confident that the new system will support the plant to efficiently provide energy to the Grid for the next 25 years.”

Storr Lochs Hydroelectric Power Station Refurbishment for SSE

Click here to download a pdf of the SSE Storr Lochs case study

Related Case Studies

Foyers Fall Power Station

Foyers Fall Power Station required to undergo a complete refurbishment/modernisation of the existing switchgear & control circuits that relate to the contro…

Sellafield Encapsulation Plant Control Upgrade

Servelec Controls carried out an Overall Project Requirements Definition and Analysis phase. This consisted of collating current information and establishing th…

GEM 80 PLC Replacement

The client's Active Drains contained a legacy GEM80-130 PLC, now obsolete and requiring replacement. Although there was an upgrade path to GEM80-500, there were…